Well Design & Engineering

Directional Drilling, Horizontal & ML Wells (3)

Date: 28th October - 1st November-2024 | Location: London

Course Duration: 2 Weeks 

Geological Concepts

    • Basic petroleum geology
    • Rock types
    • Sedimentary rocks
    • Leak Off Tests in deviated wells
    • Casing Seat Selection

Reasons For Drilling Deviated Wells

    • Side-tracking existing wells (fish or geological problems)
    • Restricted surface locations
    • Multiple targets
    • Offshore multi-well platforms
    • Environmental footprint
    • Salt dome drilling
    • Geological requirements
    • Thin reservoirs
    • Gas or water coning problems
    • Intersecting fractures
    • Re-entering existing wells

Planning and Engineering Deviated Wells:

    • Geodetic and Co-ordinate systems
    • UTM and Lambert conical projections
    • Magnetic declination
    • Grid convergence
    • True North to Grid North corrections.

Target Definition and Geological Requirements

    • Defining objectives and constraints
    • Trajectory optimisation
    • Contingency plans

Well Design Techniques

    • Radius of curvature
    • Build and hold
    • Dog-Leg Severity considerations
    • KOP vs. Build rate
    • Kick Off Points, Build Up and Drop Off Rates
    • Wellpath Design Calculations, Tools
    • Designing horizontal wells:
    • kick off points, tangent and landing sections
    • Long-, Medium-, & Short-Radius Wells
    • Multi-lateral designs.
    • Joints integrity.
    • Landing horizontal wells
    • Exercises: Directional Well Profiles using Excel sheets

Drilling Deviated Wells- Tools Selection

Rotary BHA design

        • Angle building assemblies
        • Angle holding assemblies
        • Angle dropping assemblies
        • Stabiliser types

Steerable Mud Motors

        • Principles and design
        • Operating considerations & Limitations

Rotary Steerable Systems

        • Principles and design
        • Operating considerations & Limitations

MWD Systems

        • Principles and design
        • Measurements and data transmission
        • Operating considerations & Limitations

LWD Systems

        • Principles and design
        • Measurements and data transmission
        • Operating considerations & Limitations

Drillstring Design

    • Drillstring and BHA
    • Drill pipe, grades of drill pipe and strength properties
    • Drillcollars
    • Reamers and stabilizers
    • Thread types
    • Tool joints
    • Assessment exercise
    • Calculations of approximate weight of drill pipe and tool joint
    • Drill collar weight and neutral point
    • Bending strength ratio
    • Margin of over-pull
    • Slip crushing
    • Pressure-area method
    • Jars
    • Jars and accelerators – How they work
    • Mechanical Jars
    • Hydraulic jars
    • Hydro-mechanical jars
    • Fishing jars
    • Accelerators
    • Jar Calculations
    • Shock subs
    • Working load
    • Safety factors
    • WOB
    • Buckling
    • Assessment exercise

Torque and Drag Analysis

    • Friction factors
    • Side force
    • Torsional stress
    • Axial loading
    • Critical buckling of drill string
    • Weight transfer
    • Neutral point location
    • Trajectory optimisation for T&D
    • Excel exercise using actual well data

Drilling Procedures For Deviated Wells

    • Mud Design for ERD Wells
    • Hole Cleaning
    • Casing Design and Running in ERD Wells
    • Running in and tripping out
    • Reaming and back-reaming
    • Optimisation of hydraulics / hole cleaning
    • Hole cleaning
    • Flow rates
    • Hi-Lo viscosity sweep
    • Warning signs of inadequate hole cleaning
    • Packing off

Directional Surveying

    • Survey tools
    • Survey Reference
    • Calculations And Wellpath Plotting
    • Course Corrections

Anti-collision Analysis

    • Ellipsoid of uncertainty calculations
    • 3-dimensional proximity analysis
    • Collision avoidance
    • Spider plots
    • Travelling cylinder plots 

Reservoir Aspects of Horizontal Wells

    • Drainage area
    • Concepts of Steady State and Pseudo- Steady State
    • Productivity index
    • Determining number of horizontal wells required per drainage area
    • Impact of Anisotropy
    • Effect of Length and Anisotropy on Productivity Index
    • Well exercise

ERD Wells

    • Bottomhole assemblies
    • Drillstring design for ERD
    • Tensile Loads
    • Torsional Loads
    • Buckling Considerations

Wellpath Design Calculations

    • Kick Off Points
    • Build Up and Drop Off Rates
    • Rotary Steerable Systems
    • Weight on-bit considerations

Wellbore Stability in Deviated Wells

    • Tensile and shear failure mechanisms
    • Mohr’s Envelope
    • Optimum azimuth for deviated wells
    • Maximum safe mud weight envelope

Hole Problems in Deviated Wells

    • First actions – Primary freeing methods
    • When stuck by solids or pack off
    • When stuck differentially
    • When stuck other than solids or differential
    • Assessment exercise
    • Secondary Freeing methods
    • Pills
    • U-tubing
    • Back off and fish
    • Free point