Wellhead & Xmas Trees Course

Date

TBA

Location

TBA

Instructor

TBA

Duration

4 Days

Objectives:

Course Content:

The Drilling Process:

  • Formation of Oil
  • Well Design
  • Major Rig Components
  • Rig Components
  • Well construction
  • Conductor Pipe
  • Surface Pipe
  • Intermediate casing
  • Production casing and liners
  • Video Mud Circulation
  • Video Hoisting Equipment

Wellhead Design:

  • Functions and ratings of wellhead
  • Casing head housing: design and outlets
  • Base Plate
  • Casing spools: design and outlets
  • Wellhead & Equipment Installation
  • Casing Hangers
  • Drilling Intermediate Hole and Run Casing
  • Casing Spool Construction
  • Wellhead forces

Casing landing:

  • Tubing Head Spool
  • Seals: Primary seals & Secondary seals

Testing seals

  • Tubing Hangers: design and sealing elements

Production Tubing

  • Tubing Bonnet

Back Pressure Valves

  • Xmas Trees & Valves
  • Types of Xmas trees

Components of Xmas tree

  • SPL and Pressure & Temperature ratings

Xmas Trees Selection

  • Flanges and Gaskets
  • Flange sealing

API Flanges and Ring Gaskets

  • API Type ‘R’ Ring Gasket
  • Oval & Octagonal Ring Gaskets
  • Ring Gasket
  • Ring Gasket
  • WELL COMPLETION
  • Type of well completions
  • Well completion component
  • Barrier Theory
  • Barrier Types
  • Wellhead & Xmas tree as barriers
  • Barrier Envelopes
  • tubing operations through Xmas trees
  • Methods of killing a production well

REGISTRATION FORM