Learning Outcome:
The participant will be able to assemble well data from various sources, understand their relevance, and produce a well design fit for purpose, including rig inspection, rig move, well spudding, well preparation, wellsite equipment, casing, drill bits, BHA designs, drilling fluids, and cementing.
Course Content
- Site preparation.
- Water wells, water storage and water supply.
- Site levelling and banding
- Cellar construction.
- Safety considerations.
- Camp site readiness.
- Reporting
- Rig move-in.
- Rig Mobilization to site.
- Reporting.
- Rig up operations.
- Rig up progress and monitoring.
- Ordering drilling tangibles and intangibles.
- Safety considerations.
- Reporting.
- Rig commissioning prior to spud-in.
- Rig Inspection.
- Rig standard test.
- Rig tubulars and fishing tools.
- Compliance of rig with operator regulations.
- Safety considerations.
- Regulatory and operator approvals.
- Water well testing and storage.
- Reporting.
- Inventory of Drilling equipment, materials, and procedures prior to spud.
- Essential material availability prior to spud-in.
- Rig operational procedures.
- Testing operability of rig equipment.
- Emergency response review.
- Emergency procedures review
- Safety procedures Review
- Rat hole and mouse hole preparation.
- Material orders.
- Reporting
- Spudding the well in.
- Procedures for spud-in
- Top hole drilling problems.
- Mixing of spud mud.
- Spud-in BHA
- Reporting.
- Conductor hole drilling operations.
- Drilling the conductor hole.
- Preparing the conductor casing.
- Conditioning hole for conductor casing.
- Cementing the conductor casing.
- Installing wellhead equipment & testing (Diverter).
- Well control equipment and testing.
- Clean out conductor casing.
- Preparation to drill surface hole.
- Materials availability for the next section.
- Mixing drilling fluid for next section.
- Reporting.
- Surface hole drilling operations.
- Procedures for drilling surface hole.
- Material availability for surface hole.
- Bottom hole assemblies for the surface hole.
- Anticipated drilling problems in the surface hole.
- Drilling surface hole.
- Preparing surface casing.
- Running Surface casing.
- Cementing Surface casing.
- Wellhead installation and testing.
- Well control equipment and testing.
- Surface casing clean out.
- Surface casing pressure testing.
- Materials availability for the next section.
- Mixing drilling fluid for next section.
- Reporting.
- First intermediate hole drilling operations.
- Procedures for drilling first intermediate hole.
- Material availability for first intermediate hole.
- Bottom hole assemblies for the first intermediate hole.
- Anticipated drilling problems in the first intermediate hole.
- Testing surface casing.
- Drilling first intermediate hole.
- Preparing first intermediate hole.
- Running first intermediate hole.
- Cementing first intermediate hole.
- Wellhead installation and testing.
- Well control equipment and testing.
- First intermediate casing cleans out.
- First intermediate casing pressure testing.
- Materials availability for the next section.
- Mixing drilling fluid for next section.
- Reporting.
- Second intermediate hole drilling operation.
- Procedures for drilling Second intermediate hole.
- Material availability for Second intermediate hole.
- Bottom hole assemblies for the Second intermediate hole.
- Anticipated drilling problems in Second intermediate hole.
- Drilling Second intermediate hole.
- Preparing Second intermediate casing.
- Running Second intermediate casing.
- Cementing Second intermediate casing.
- Wellhead installation and testing.
- Second intermediate casing cleans out.
- Second intermediate casing pressure testing.
- Materials availability for the next section.
- Mixing drilling fluid for next section.
- Reporting.
- Production hole drilling operations.
- Procedures for drilling the production hole.
- Material availability for drilling the production hole.
- Bottom hole assemblies for the production hole
- Anticipated problems in production hole.
- Drilling production hole.
- Coring production hole.
- Logging production hole.
- Preparing production casing/liner.
- Reaming Production hole.
- Run production casing/Liner.
- Cementing Production casing /Liner.
- Clean out production casing/Liner.
- Pressure testing production casing/liner.
- Preparing completion fluid.
- Displacement of drilling fluid.
- Lay down tubular.
- Run in hole tubing string.
- Displace hole to completion fluids.
- Installing X-mas tree and testing.
- Reporting.
- Rig release.
- Return of operator’s materials.
- Rig release procedures.
- Safety consideration.
- Lay down rig equipment.
- Reporting.
- Rig move out.
- Rig equipment move out of location.
- Safety considerations
- Reporting