Managing Wellsite Operations (On Demand Only)

Date

TBA

Location

TBA

Instructor

TBA

Duration

4 Days

Objectives:

Course Content:

Learning Outcome:

The participant will be able to assemble well data from various sources, understand their relevance, and produce a well design fit for purpose, including rig inspection, rig move, well spudding, well preparation, wellsite equipment, casing, drill bits, BHA designs, drilling fluids, and cementing.

Course Content

  1. Site preparation.
    • Water wells, water storage and water supply.
    • Site levelling and banding
    • Cellar construction.
    • Safety considerations.
    • Camp site readiness.
    • Reporting
  2. Rig move-in.
    • Rig Mobilization to site.
    • Reporting.
  3. Rig up operations.
    • Rig up progress and monitoring.
    • Ordering drilling tangibles and intangibles.
    • Safety considerations.
    • Reporting.
  4. Rig commissioning prior to spud-in.
    • Rig Inspection.
    • Rig standard test.
    • Rig tubulars and fishing tools.
    • Compliance of rig with operator regulations.
    • Safety considerations.
    • Regulatory and operator approvals.
    • Water well testing and storage.
    • Reporting.
  5. Inventory of Drilling equipment, materials, and procedures prior to spud.
    • Essential material availability prior to spud-in.
    • Rig operational procedures.
    • Testing operability of rig equipment.
    • Emergency response review.
    • Emergency procedures review
    • Safety procedures Review
    • Rat hole and mouse hole preparation.
    • Material orders.
    • Reporting
  6. Spudding the well in.
    • Procedures for spud-in
    • Top hole drilling problems.
    • Mixing of spud mud.
    • Spud-in BHA
    • Reporting.
  7. Conductor hole drilling operations.
    • Drilling the conductor hole.
    • Preparing the conductor casing.
    • Conditioning hole for conductor casing.
    • Cementing the conductor casing.
    • Installing wellhead equipment & testing (Diverter).
    • Well control equipment and testing.
    • Clean out conductor casing.
    • Preparation to drill surface hole.
    • Materials availability for the next section.
    • Mixing drilling fluid for next section.
    • Reporting.
  8. Surface hole drilling operations.
    • Procedures for drilling surface hole.
    • Material availability for surface hole.
    • Bottom hole assemblies for the surface hole.
    • Anticipated drilling problems in the surface hole.
    • Drilling surface hole.
    • Preparing surface casing.
    • Running Surface casing.
    • Cementing Surface casing.
    • Wellhead installation and testing.
    • Well control equipment and testing.
    • Surface casing clean out.
    • Surface casing pressure testing.
    • Materials availability for the next section.
    • Mixing drilling fluid for next section.
    • Reporting.
  9. First intermediate hole drilling operations.
    • Procedures for drilling first intermediate hole.
    • Material availability for first intermediate hole.
    • Bottom hole assemblies for the first intermediate hole.
    • Anticipated drilling problems in the first intermediate hole.
    • Testing surface casing.
    • Drilling first intermediate hole.
    • Preparing first intermediate hole.
    • Running first intermediate hole.
    • Cementing first intermediate hole.
    • Wellhead installation and testing.
    • Well control equipment and testing.
    • First intermediate casing cleans out.
    • First intermediate casing pressure testing.
    • Materials availability for the next section.
    • Mixing drilling fluid for next section.
    • Reporting.
  10. Second intermediate hole drilling operation.
    • Procedures for drilling Second intermediate hole.
    • Material availability for Second intermediate hole.
    • Bottom hole assemblies for the Second intermediate hole.
    • Anticipated drilling problems in Second intermediate hole.
    • Drilling Second intermediate hole.
    • Preparing Second intermediate casing.
    • Running Second intermediate casing.
    • Cementing Second intermediate casing.
    • Wellhead installation and testing.
    • Second intermediate casing cleans out.
    • Second intermediate casing pressure testing.
    • Materials availability for the next section.
    • Mixing drilling fluid for next section.
    • Reporting.
  11. Production hole drilling operations.
    • Procedures for drilling the production hole.
    • Material availability for drilling the production hole.
    • Bottom hole assemblies for the production hole
    • Anticipated problems in production hole.
    • Drilling production hole.
    • Coring production hole.
    • Logging production hole.
    • Preparing production casing/liner.
    • Reaming Production hole.
    • Run production casing/Liner.
    • Cementing Production casing /Liner.
    • Clean out production casing/Liner.
    • Pressure testing production casing/liner.
    • Preparing completion fluid.
    • Displacement of drilling fluid.
    • Lay down tubular.
    • Run in hole tubing string.
    • Displace hole to completion fluids.
    • Installing X-mas tree and testing.
    • Reporting.
  12. Rig release.
    • Return of operator’s materials.
    • Rig release procedures.
    • Safety consideration.
    • Lay down rig equipment.
    • Reporting.
  13. Rig move out.
    • Rig equipment move out of location.
    • Safety considerations
    • Reporting